A Project planning is an iterative process that communicates the approach and intent of Project manager.
Civil
-
-
Valuation is the process of estimating the cost of property based on its present conditions.
-
The materials which are used for building any structure is called Construction material.
-
The Roads are classified according to Nagpur plan, traffic and tonnage.
-
SBPS is a fast and accurate method of determining the location of any point of interest anywhere on the face of the earth of any time during day or night.
-
A Science and art of collecting information about objects, area from long or short distance without doing any physical contact with them is called remote sensing.
-
On the basis of purpose of construction of reservoir, it is classified into three types: Storage, Flood control and Distribution reservoir.
-
The Notice which invites tenders which is a written offer submitted by the contractors for carrying out the work at certain rates with terms and conditions laid down is called tender notice.
-
In this process the oxygen is absorbed and carbon dioxide is released. It reduces the percentage of carbon dioxide up to 70%