Construction Equipment Basics
Key Takeaways:
Conventional constructing approach is described as additives of the constructing which can be pre-fabricated on web page through the approaches or wooden or plywood formwork installation, metallic reinforcement and forged in-situ.Mechanization is the procedure of transferring from running in large part or completely with the aid of using hand to do this paintings the usage of machines.
Key Takeaways:
The advantages are as follows:
Excavators:
Backhoe Loaders:
Bulldozers:
Skid-Steer Loaders:
Trenchers:
Key Takeaways:
The Earthmoving equipments are as follows:
Centrifuges:
Vacuum filter:
Filter Presses:
Drying Beds:
Depth of sludge
Moisture content material of sludge
Availability of sand mattress area
Sludge Lagoons:
Gravity and Low-Pressure Devices:
Key Takeaways:
The dewatering equipment are as follows:
There are extensive kinds of concrete mixers:
1. Batch mixers:
a. Drum Types Mixer
b. Pan Type Mixer
2. Continuous mixers
1. Batch Concrete Mixers:
Drum kind mixers
Pan kind mixers
2. Continuous Concrete Mixers
Key Takeaways:
Equpiment for concrete mixing are as follows:
Dumpers:
Tippers:
Trailers:
Key Takeaways:
Equipment for transporting are as follows:
Steel Bucket:
Vehicles or railcars:
Chutes:
Conveyor:
Pumping:
Key Takeaways:
Equipment for placing are as follows:
Cranes:
Crane dangers:
Electrical dangers:
Structural failure and overloading:
Control Measures:
Hoist:
Other equipment for lifting:
Elevators:
Escalators:
Key Takeaways:
Crane: A crane is a form of machine, normally geared up with a hoist rope, cord ropes or chains, and sheaves, that may be used each to raise and decrease substances and to transport them horizontally.
Hoist: Building hoists are transient installations used on production web sites for the delivery of folks and substances.
Other equipment for lifting: Elevators, Escalators etc.
1. Tipper Trucks:
2. Concrete Trucks:
3. Trailer Trucks:
4. Tankers:
5. Dump Trucks:
Key Takeaways:
Equipment for transportation of materials are as follows:
Keep tune of efficient, standby and nonproductive time.
Consider the hourly fee of proudly owning or renting device.
Monitor variable vs. constant costs.
Manage device renovation and repair.
Schedule device efficiently.
Select the proper device for the job.
Key Takeaways:
It is the most hassle confronting many production firms. Contractors generally degree their productiveness through taking their output and dividing it through the quantity of hard work hours required to gain the output.
References:
1. Varghese,P.C.,”Building Construction”,Prentice Hall India,2007.
2. National Building Code, Bureau of Indian Standards,New Delhi,2017.
3. Chudley,R.,Construction Technology,ELBS Publishers,2007.
4. Nunnally,S.W.Construction Methods and Management,Prentice Hall,2006