Unit - 5
Planning and Organizing Construction Site and Resources
Key Takeaways:
Site making plans in particular, has been the maximum left out issue with inside the production industry and the mindset of the engineers has been that it will likely be performed because the challenge progress. It is crucial to realise that the web website online making plans might be the situations that web website online employees will stay with for the overall length of the development period. Thus the cautious pre-making plans is imperative.
Records at Construction Site:
The following are the diverse data that want to be maintained at creation webpage,
1. Drawings
2. Contract Agreement
3. Time and Progress Charts or CPM Charts
4. Work Orders Book
5. Works Diary
Key Takeaways:
Records at Construction Site are as follows:
Key Takeaways:
To develop any organization, it is absolutely necessary to have manpower development.This is the reason why manpower planning is important.
Key Takeaways:
Matching the organizational needs for human resource and satisfy individual by promoting for self development.
Key Takeaways:
Staffing is nothing but assembling all the competent human resource for completing project work in decided timeframe with all possible efforts for development of both i.e. human resource and construction firm.
Key Takeaways:
Attitudes themselves replicate the interaction of many long-time period and short-time period elements which includes motivation, way of life, control structures, nature of the paintings and really man or woman and sensitive matters inclusive of private cost structures and existence objectives.
Key Takeaways:
A material manager always takes responsibility of material availability at right time. This includes procurement of materials, tools, stores and services for converting raw material to finished product. Purchasing should be performed at right time and at right cost.
Key Takeaways:
It refers to heavy-responsibility vehicles, in particular designed for executing creation tasks, maximum regularly ones related to earthwork operations. kindly test underneath the development system kinds and creation system list. Construction system for constructing creation and creation equipment utilized in creation projects.
Key Takeaways:
To make certain most beneficial existence of system with decrease operation cost. To execute its application even as optimize aid usage with better productivity. To lessen plant and system breakdown hours. To keep lowest stock and procurement of spares in time.
Key Takeaways:
It is the approach with the aid of using which economic resources, typically capital, however every now and then additionally time, skills, land, information, etc., are furnished for the functions of a production mission. Funding has a tendency to consult reserves which can be inner to the organization, at the same time as the external sourcing of capital is noted as financing (despite the fact that the phrases are every now and then used as though they're interchangeable).
Key Takeaways:
It is one of the most important financial statements for a project or business. A cash flow statement is a listing of the flows of cash into and out of the business or project. Think of it as your checking account at the bank. Deposits are the cash inflow and withdrawals (checks) are the cash outflows.
Personal investment:
Love cash:
Venture capital:
Business incubators:
Government grants and subsidies:
Key Takeaways:
Sources of funds are as follows:
Key Takeaways:
Histograms make inferences from the bar graph. It corresponds to a hard and fast of variables for a selected records set. Thus, the location of every bar alongside the X-axis is the price of the periods earlier than the extrade occurs. In order to research the records, the frequency of the prevalence of the variables is decided with the aid of using searching at the peak of the bar.
Key Takeaways:
It is a mathematical graph that depicts applicable cumulative statistics for a challenge including price or man-hours plotted towards time. The purpose it’s known as an s-curve is due to the fact the form of the graph generally paperwork a loose, shallow “S.” An s-curve in challenge control is generally used to song the development of a challenge. In today’s fast paced enterprise climate, making sure that a challenge is on time table and on price range is paramount to its success.
Key Takeaways:
It is a method utilized by groups to prepare and shape their personnel so the responsibilities they want to finish are scheduled primarily based totally on availability and capability. Using this method, crew leaders can allocate and assign humans responsibilities with out over (or under) allocating their schedules.
Key Takeaways:
A Gantt chart or more popularly known as the bar chart is one of the most commonly used project management tools and are used in tracking project schedules.
Advantages of LOB:
Disadvantages of LOB:
Key Takeaways:
LOB is a linear technique that allows the balancing of operations such that each activity is continuously and efficiently performed in each consecutive unit.
Key Takeaways:
The useful resource-restrained task scheduling trouble (RCPSP) affords an extension to the same old Critical Path Method (CPM) and Program Evaluation and Review Techniques (PERT) through consisting of the supply of assets.
Key Takeaways:
Resource aggregation is definitely the summation, on a length-via way of means of-length basis, of the assets required to finish all sports primarily based totally at the useful resource allocation carried out previously.
Key Takeaways:
Objective is to allocate available resources to activities of a project with the sole intention of ensuring the completion of the project in the shortest project duration within the limits of the resources made available to the project.
Criteria for Resource Smoothing:
Procedure for Resource Smoothing:
Key Takeaways:
Resource smoothening Is the analysis of the project network aimed at reducing the peak demand for resources and reallocating them among activities of a project in a manner that ensures that the project duration remains the shortest. In smaller or simpler projects, resource loading can be done by simply analysing the project network to find out the demand for resources.
Key Takeaways:
The project manager aims to keep the total amount of resources in use during the project as-nearly constant as possible and ensure their optimum utilization during the entire course of the project.Thus, the project manager aims at levelling resources to ensure steady progress and expenditure.
1. Set a Clear Project Scope
2. Set Up for Success
3. Focus at the Details
4. Anticipate Project Setbacks
5. Communicate Regularly
6. Stay On Top of Trends
Key Takeaways:
Common good practices are as follows:
References:
1. Varghese, P.C.,” Building Construction”, Prentice Hall India,2007.
2. National Building Code, Bureau of Indian Standards,New Delhi,2017.
3. Chudley,R.,Construction Technology,ELBS Publishers,2007.
4. Nunnally,S.W.Construction Methods and Management,Prentice Hall,2006