Unit - 7
Contracts Management Basics
Key Takeaways:
Written contracts additionally assist to guide—or maybe force—the events to conform with affordable enterprise tactics due to the fact that the ones tactics might be especially spelled out in a well-written settlement and emerge as necessities of every celebration
Types of Contract are as follows:
(A) Item rate contract
Advantages:
Disadvantages:
(B) Lump sum contract:
Advantages:
Disadvantages:
(C) Cost pulse percentage rate contract:
Advantages:
Disadvantages:
Key Takeaways:
Types of Contract are as follows:
Common contract clauses contains following things:
Scope of labor:
Contract quantity:
Project duration:
Payment phrases:
Variation clause:
Liquidated damages:
Dispute decision:
Key Takeaways:
Common contract clauses are as follows:
Why Is a Notice to Proceed Important?
Key Takeaways:
Notice to Proceed is a notification letter indicating that overall performance have to start beneath a production contract. Any celebration that has employed any other celebration at the task would possibly make use of a Notice to Proceed to signify the recipient have to begin their paintings.
Key Takeaways:
Creation managers are those who're answerable for the venture to continue in keeping with the prevailing plan. The number one venture for creation managers is to control their venture in a manner to be able to make certain its crowning glory at the agreed price range and time.Furthermore, they must make certain that the complete venture is complying with the set constructing plans, codes and different regulations.
Key Takeaways:
Notice clauses are important due to the fact they permit the birthday celebration using the builder in a creation project (the agency) an possibility to take into account the difficulty raised and extra time to react to troubles which includes delays.
1. Annualized Contract Value (ACV)
2. Terminated Contract Remaining Value (TRV)
3. Order Value Variance from Original Contract Value (OVV)
4. Vendor Fraud
5. Compliance
6. Quality/Complaints Resolved
Key Takeaways:
Performance parameters are as follows:
Delays:
The delays are labeled or classified into 4 fundamental ways:
A) Critical or non-vital Delays:
B) Excusable & non-excusable Delay:
C) Concurrent Delays in Construction Projects:
D) Compensable or non-compensable Delays in in Construction Projects:
Penalties:
Liquidated damages:
Key Takeaways:
Delays: The delays are labeled or classified into 4 fundamental ways:
Liquidated damages: It is an amount of compensation payable by contractor to the owner or government due to delayed construction having no relationship with real damage.
Penalties :A penalty, as its call suggests, is with inside the nature of a punishment for non-observance of a contractual stipulation; it includes the imposition of an extra or different liability upon breach of the contractual stipulation”.
Key Takeaways:
Force majeure is a not unusual place clause in contracts which basically frees each events from liability or responsibility while an great occasion or condition past the manage of the events, including a war, strike, riot, crime, epidemic, surprising felony changes, or an occasion defined with the aid of using the felony term act of God, prevents one or each events from pleasing their responsibilities beneath the agreement.
Key Takeaways:
To terminate a contract registered notice is served on contractor framing charges against him for violation of clause or terms and conditions of contract allowing fixed time usually 7 or 14 days.
Key Takeaways:
A variation (on occasion called a alternate) is an alteration to the scope of labor at first certain with inside the settlement, whether or not via way of means of manner of an addition, omission, or substitution to the works, or via a alternate to the way wherein the works are to be carried out.
Key Takeaways:
Dispute Board (DB) comprises a board of one or three persons, independent of the contracting parties, engaged to perform an overview role of the execution of the project and the contract. Its primary function is to assist the parties to avoid disputes if possible, or if not, to assist them to a speedy, cost-effective and acceptable resolution of disputes, and avoid the need for arbitration or litigation.
References:
1. Varghese, P.C.,” Building Construction”, Prentice Hall India,2007.
2. National Building Code, Bureau of Indian Standards,New Delhi,2017.
3. Chudley,R.,Construction Technology,ELBS Publishers,2007.
4. Nunnally,S.W.Construction Methods and Management,Prentice Hall,2006