Unit - 8
Construction Costs
Key Takeaways:
Construction value estimates are created at many distinctive factors in time in the course of a mission. The proprietor can also additionally expand very early feasibility estimates to decide if a mission is economically viable.
Key Takeaways:
Production costs could be those costs incurred through the actual production works themselves, and on some projects can be decided through the value of the agreement with the important contractor.
1. The People Costs:
2. The Administrative Costs
3. Project Resource Costs
A. Direct Costs vs. Indirect Costs:
Key Takeaways:
Classification of costs are as follows:
Rules for Crashing:
Steps in Crashing:
Key Takeaways:
The effect of expediting the project activities on its cost is referred to as time-cost trade-off. The activities on the critical path need to only be taken into consideration as they determine the project duration. Crashing of non-critical activities would not prove useful as it will not assist in reducing the project duration.
Key Takeaways:
Compression of a pastime refers back to the discount with inside the period of a pastime through growing the assets allotted to it or through decreasing the technical specification of the work. Decompression is the method of restoring compressed statistics to its authentic form. Data decompression is needed in nearly all instances of compressed statistics, consisting of lossy and lossless compression.
References:
1. Varghese, P.C.,” Building Construction”, Prentice Hall India,2007.
2. National Building Code, Bureau of Indian Standards,New Delhi,2017.
3. Chudley,R.,Construction Technology,ELBS Publishers,2007.
4. Nunnally,S.W.Construction Methods and Management,Prentice Hall,2006