UNIT II
Types and Classification
Composition of elements of cost:
The manufacturing organization converts raw materials into finished products. To that end, it employs labour and provides other facilities. It is necessary to check the amount spent on all this, while aggregating the cost of production. For this purpose, the cost is mainly classified into various factors. This classification is necessary for accounting and management.
The cost elements are
(i) Direct material
(II) Direct labour
(iii) Direct expenses and
(iv) Overhead.
The following chart shows the wide heading of the cost and these acts as the basis for preparing the cost sheet.
Elements of cost
Materials Labour OtherExpenses
Direct Indirect Direct Indirect Direct Indirect
Overheads
Factory Administrative Selling &Distribution
Break up of cost sheet
Classification of Cost
Prime cost:
The sum of direct material costs, direct labor and direct costs is called Prime costs. The direct cost is traceable to the product or job.
Direct material
This includes the costs of materials consumed in the production process that can be assigned directly to the cost centre. Direct materials can be identified and filled into
For example、:
- Materials purchased specifically for a particular job or process.
- Materials passing from one process to another.
- Consumption of materials or parts manufactured in the same factory.
- Primary packing material.
- Freight, insurance and other transportation costs, import duties, ochry duties, inward transportation, storage and handling costs are treated as the direct cost of the material consumed.
In some cases, direct materials are used in small quantities, and it is impossible to check and directly allocate their costs. For example, nails used in the manufacture of chairs and tables, glue used in the manufacture of toys. In such cases, the cost of the total quantity consumed during the period is treated as an indirect cost.
Direct labour
This includes the number of wages that can be easily identified and billed directly to the product. These are the costs for converting raw materials into finished products. Wages paid to workers to operate lathe machines, drilling machines etc. In the tool room is a direct pay.
Direct expenses
This includes costs other than materials and labour that can be easily identified in a particular product or process. For example: the cost of excise duty. Overhead costs cannot be easily identified in a particular product or process.
Indirect materials
Materials that cannot be traced as part of a finished product are known as indirect materials.
For example、:
- Consumable stores such as lubricants, cotton waste, tools etc.
- For direct charging, such as nails (for making chairs) glue (for making toys), non-important materials that are not worth checking the cost separately. Allocate with these materials. Or absorb any in cost centres or cost units.
Indirect labor:
Indirect labor is a cost that cannot be invoiced or identified directly on the finished product. Indirect labor is assigned to or appropriately absorbed by the cost centre or cost unit.
For example、:
- Salary to store-keeper
- Wages to timekeepers
Overhead:
These are general costs that are not incurred for a particular product or service and cannot be billed directly to the product.
For example、:
- Factory rent, rates and insurance
- Power, lighting, heating, repair, telephone costs, printing and stationery.
Overhead can be subdivided into the following main groups.
Factory or work overhead: Also known as manufacturing or production overhead it consists of all the costs of indirect materials, indirect labor and other overhead incurred in the factory.
Example: Factory rent and insurance. Depreciation of factory buildings and machinery.
Office or management overhead: All indirect costs incurred by the office for the management and management of the enterprise.
Examples: Rent, fees, taxes and insurance for office buildings, audit fees, director fees.
Sales and distribution overhead: These are overhead related to marketing and sales.
Examples: Advertising of distributors, salaries and fees, travel expenses of salesmen.
Key takeaways
- Classification is necessary for accounting and management.
- Overhead subdivision.
A material is a substance (physical term) that is part of a finished product or is composed of a finished product. In other words, a material is a product that is supplied to a business for the purpose of consuming it in the process of manufacturing or providing services, or for the purpose of converting it into a product. The term "store" is often used as a synonym for material, but store has a broader meaning, not only the raw materials consumed or used in production, but also miscellaneous goods, maintenance stores, processed parts, components. Also includes items such as tools. Jigs, other items, consumables, lubricants, etc. Finished and partially finished products are also often included in the term "store". Materials are also called inventory. The term material / inventory includes not only raw materials, but also components; work in process, finished products, and scrap.
Material costs are an important component of the total cost of a product. It accounts for 40% to 80% of the total cost. Percentages may vary from industry to industry. But for the manufacturing sector, material costs are paramount. Inventory is also an important component of working capital. Therefore, it is treated the same as cash. Therefore, analysis and control of material costs is very important.
Purpose of material management system
Material management: The ability to ensure sufficient inventory of goods to meet all requirements without carrying unnecessarily large amounts of inventory.
The purpose of the material management system is to:
2. Make the material available continuously so that the flow of material for production is uninterrupted. Production cannot be postponed due to lack of materials.
2. Purchase the required number of materials to avoid working capital locks and minimize the risk of surplus or obsolete stores.
3. Make competitive and wise purchases at the most economical prices so that you can reduce material costs.
4. Purchase the right quality material to minimize the waste of material.
5. Acts as an information centre for material knowledge about prices, suppliers, lead times, quality and specifications.
Key takeaways:
- A material is a substance (physical term) that is part of a finished product or is composed of a finished product.
- The ability to ensure sufficient inventory of goods to meet all requirements without carrying unnecessarily large amounts of inventory.
Introduction to purchasing materials:
For manufacturing concerns, there is another purchasing department under the control of the purchasing person. The main function of the purchasing department is to purchase the required number of materials in time so that the store can provide the production department with a continuous supply of materials and purchase higher quality materials at a reasonable price.
Buyers need to play an important role as they can save or lose a lot of money. He requires good technical knowledge of the industry and some management skills. He also needs to be aware of management policies and sources of concern.
He also needs to be aware of market conditions and have knowledge of suppliers, trusted suppliers, prices and purchasing procedures.
He must keep up with government policies on import and export restrictions and various tariffs and taxes on goods. He must have practical knowledge of the law relating to contracts and the sale of goods so that he can negotiate and enter into contracts on behalf of his employer.
Centralized and Decentralized purchases:
Centralized purchase:
Centralized purchase means the purchase of materials by one specialized department. The purchasing department has personnel with expertise in all aspects of the material. The purchasing department has the authority to make purchases for the entire organization.
In this system, the requirements of the entire organization are confirmed through the creation of purchasing budget, the purchasing department makes purchases according to the accepted principle, and the materials are distributed to each production department according to the requirements.
In most cases, the purchasing department purchases materials based on the requisition form issued by the store. The supplier delivers the material to the Material Receipt section. Individual departments are not allowed to purchase their own materials when centralized purchases are made.
Decentralized purchase:
Decentralized purchases mean that each department can purchase materials according to their needs. Therefore, the authority to make purchases rests with the individual departments.
(A) Advantages of local purchase: If the production unit is far from the body, it is beneficial to have the unit available for purchase locally. You can enjoy the benefits of basic low price and seasonal price, and reduce the cost.
(B) Reduction of transportation costs: By supplying materials locally, transportation costs will be significantly reduced.
(C) Quick resolution of the problem: Disputes caused by refusals, shortages and returns can be resolved easily and quickly.
Advantages of centralized purchase:
From a centralized purchase, you can derive the following benefits:
a) Benefits of bulk purchase: Because materials are purchased in bulk, trade discount rates are high, credit lines are improved, bargaining power, quantity, and discounts are increased, so materials can be purchased at much lower prices.
(B) Maintaining quality: All purchases are made by the purchasing department, which has expertise in product quality, which helps maintain the quality of the materials and ultimately leads to the production of better-quality finished products. Improving product quality ensures that your business is more credible, resulting in higher sales and higher profits.
(C) Reduction of transportation costs: This system purchases materials in bulk, significantly reducing shipping costs. This has a positive impact on the total cost or unit cost of the material. This makes your organization more competitive.
(D) Advantages of specialization: The Purchasing Department has dedicated purchasing personnel to ensure the right purchases from the right type of supplier. This guarantee both quality and price.
(E) You can avoid duplication: All purchases are made by one person, avoiding duplicate purchases.
(F) Planned purchases: You can systematically eliminate the purchase and holding of surplus stores, which enables better space management and easily avoids unnecessary blocks of working capital.
Restriction:
The restrictions on centralized purchases are as follows:
(A) Expensive
The management costs of the purchasing department can be very high, resulting in a solid increase in total costs and defeating the very purpose of costs to reduce costs.
(B) It functions as an obstacle to smooth functioning.
If a production department does not have the materials it needs, it must wait for the purchasing department to purchase it. This delay leads to production outages, which in turn leads to increased costs.
Purchasing routine:
In general, the following routine is used to purchase materials.
(I) Request for purchase. The request is made by the store officer.
(Ii) Offering bids and quotations for the supply of the required amount of material.
(Iii) Place an order with a supplier after considering bids and quotations submitted by different suppliers.
(Iv) Receipt of material after proper inspection.
(V) Confirm and pass the supplier's payment invoice.
Purchase requisition:
The decision to purchase the material is made by the purchasing department after receiving the purchase request from the authorized department. A purchase request is made from an approved department to the purchasing department in a prescribed form called a purchase request.
Requisitions provide three basic pieces of information that help buyers perform their purchasing functions efficiently.
The information is as follows:
- What materials to buy (purchasing the right quality).
- When to buy (appropriate time).
- Amount to purchase (appropriate quantity).
Purchase requisitions are received by the purchaser from:
(I) Shopkeepers of all standard materials.
(II) Production control department of non-standard materials required for production.
(III) Plant and maintenance engineers for special maintenance and capital investment.
(IV) Head of special items such as office supplies.
The requisition is created three times. Two copies will be sent to the purchasing department, one copy will be retained as proof of approval and the other copy will be returned to the inventor after quoting the order details. Purchasing department. A third copy is kept by the store for office records and future references.
Material specifications or bill of materials:
The requisition contains details and specifications of the materials to purchase. Material specifications are known as bills of material. This starts in the production control department or the plant and maintenance engineer department. The BUI of Material is a complete schedule of materials or parts required for a particular job or work order created by a drafting office.
A bill of materials is created for every job and a copy is sent to the storekeeper.
BOM Benefits:
The following benefits can be obtained in different departments of the BOM.
(I) upon receiving the bill of materials, the purchasing department can place an order with the supplier of choice. Therefore, the bill of materials serves the purpose of the purchase requisition.
(Ii) The bill of materials allows the store to publish materials.
(Iii) The bill of materials contains details of the materials used in the job or work order, so the supervisor does not need to prepare detailed material requirements. This saves time and makes it easier to pull out the material.
Purchase time:
Requisitions indicate the date on which the use of the material is required. The storekeeper makes a request to the purchaser as soon as the material reaches the reorder level. Upon receiving the purchase requisition, the purchaser places an order with the supplier with a delivery date.
Delivery times are fixed taking into account the material consumption rate and the minimum level fixed to it.
Purchases are also made when market conditions are good, despite the fact that there is no immediate need for materials for production. In an inflationary economy, we buy materials in bulk in the hope that prices will rise further.
For raw materials such as jute, cotton and sugar cane, quantity, quality and price are used to make bulk purchases during the season. To prevent future price increases, long-term contracts may be entered into with suppliers to purchase materials for a specified period of time and at a specified rate.
However, in doing so, the purchaser must take into account the following factors:
(I) A storage facility for storing quantities.
(Ii) Financial resources of concern. And
(Iii) Transportation costs, capital costs, storage costs, etc.
Purchase quantity:
Before placing an order with a supplier, the purchaser must ensure that only the right quantity of stores is purchased. The following factors should be taken into account when determining the purchase quantity:
(I) Material inventory levels must be maintained to meet the requirements of the production sector.
(Ii) Production is not hindered by a shortage of raw materials.
(Iii) There should be no excess inventory or material shortage inventory to unnecessarily block working capital. And
(Iv) Availability of funds
Purchase order:
Definition:
A purchase order is an agreement between a material buyer and a supplier. It is a requirement from the purchaser to the supplier to supply goods of a specific quantity and quality in accordance with the terms set forth in the contract. It also means the buyer's commitment to deliver and pay for the goods according to the terms and conditions stated on the purchase order.
After carefully determining the purchase quantity, the purchasing department should place an order with the supplier of choice. You need to choose a supplier that can deliver the products you need at a competitive price and at the right time. We are looking for a quote from our supplier.
Quotations received from different suppliers are compared and an acceptable supplier is selected. After completing the above procedure, a purchase order will be issued to the supplier to supply the required quantity of goods at the specified time.
Purchase order i is issued in the prescribed format, produced in quadruples (4 copies), and sent to the next department for reference and coordination.
(I) the first copy will be sent to the supplier.
(Ii) One copy will be sent to the department that sent the purchase requisition.
(Iii) One copy will be sent to the store or the internal department of the product.
(Iv) One copy will be kept in the purchasing department as a permanent record.
(V) A copy will be sent to your account department.
Purchase procedure:
Purchasing departments need to follow specific steps for efficient purchasing. The purchasing procedure includes the following steps:
(2) Purchase request:
Receive purchase requisitions that you might receive from your store, production control department, or department manager. The amount of material you purchase should be carefully determined.
(2) Supplier search:
Purchasing departments need to find potential suppliers. Care must be taken when choosing the right supplier. Once the supplier has been identified, you will be asked to submit a quote or bid. You need to start bidding and select a supplier considering the conditions stated in the bid.
(3) Purchase order:
Once a supplier is selected, you need to pass the purchase order to the selected supplier. A copy of the purchase order should be sent to the original department, the accounting department, and one copy to the costing department.
(4) Receipt of materials:
The materials you receive must be entered in the receipt note and sent to the inspection department for inspection. After receiving the inspection report, the material is sent to the store and shipped to the manufacturing department.
To better understand the chart in this regard, it is shown below.
Receipt of goods:
The following chart shows the procedure for receiving and inspecting materials.
The warehousing department is usually located at the entrance of the factory. All carriers of goods are to report to this department. After receiving the delivery note or shipping advice from the supplier, the receiving department must arrange the unloading of the goods.
The receiving office must receive the goods after comparing the quantity, quality, and other details that should have been included in the purchase order. When you receive the item, you should check it by weighing, counting, or inspection.
If there is any damage or missing, you should state that fact on the carrier's copy or Challan. After being satisfied in all respects, the recipient of the goods must sign a copy of the carrier Challan. Next, you need to enter the item details on the receipt (below). The receipt memo is an important document and is required to confirm the supplier's invoice and pass it to payment.
The goods receipt note is prepared with an additional copy distributed as follows:
(I) to the purchasing department to update the purchase record.
(Ii) To the department that sent the purchase request.
(Iii) To the accounting and inventory management department.
(Iv) To the shop owner. And
(V) Stored in the receiving department for records and future reference.
Goods receipt note (GRN):
This is a testimony of the goods received according to the purchase order. Otherwise, the supplier will be notified by formal contact. When making adjustments for damaged or defective items, it is customary to send a debit note to the supplier with the value of the damaged or rejected item and the shipping costs for the return.
Confirmation of purchase invoice:
Along with the goods, the supplier sends an invoice containing details of the materials supplied and their price.
The purchaser who receives the material should refer to the following document to verify the accuracy of the details.
(I) Order form.
(Ii) Receipt notes.
(Iii) Inspection report.
(IV) Debit notes (if any).
If the invoice is determined to be correct, it will be stamped with a rubber stamp by the responsible authority of the purchasing department and passed to the accounting department for payment. Invoices are now checked by an authorized person in the accounting department to ensure that the calculations are correct.
The invoice will be entered in the purchase diary that will be credited to the supplier's account. Periodically, the purchase journal totals are debited to the general ledger purchase account.
Key takeaways:
- The main function of the purchasing department is to purchase the required amount of materials.
- Centralized purchase means the purchase of materials by one specialized department.
- Decentralized purchases mean that each department can purchase materials according to their needs.
- From a centralized purchase there arecertain benefits.
- A purchase request is made from an approved department to the purchasing department in a prescribed form called a purchase request.
- The requisition contains details and specifications of the materials to purchase.
- Before placing an order with a supplier, the purchaser must ensure that only the right quantity of stores is purchased.
- Goods receipt note (GRN)testimony of the goods received according to the purchase order.
Storage of materials should not pose a danger. Make sure that the material stored in the tier is blocked. Interlocked and height limited, so drop, slide, or Collapse. Store all ingredients on pallets immediately to prevent rodent invasion. Clean up spills and leaks that create a rodent habitat. When lifting the bag using a sling Materials, wood, brick, masonry blocks, and similar loosely stacked materials. The sling is inspected before use and the material and load are completely fixed against drops by straps, sideboards, nets, or other suitable devices. See reclamation Health and Safety Standards (RSHS) Section 28, sling and rigging hardware, and for additional information on rigging and rigging, see Section 29, Hoists and Pile Driving Equipment Winding operation.
Once you receive the material, it is the responsibility of the store in charge to ensure that it is only done for documents that allow the material to enter or leave the store. The store in charge is responsible for making good use of storage space, better managing the materials in the store, and properly protecting the materials from all losses such as theft, theft, fire and misappropriation.
Shopkeeper duty:
The duties of the shopkeeper are as follows.
a. Overall control of all activities in the store department.
b. To ensure the safe storage of materials.
c. To maintain a proper record.
d. Whenever the inventory level of an item in the store reaches the minimum level, we initiate a requisition to replace the inventory of all regular materials.
e. When the inventory level approaches the maximum level, it will take action to stop further purchases.
f. Issue only the required amount of material for the approved request document.
g. We will review and receive the purchased materials transferred from the receiving department and arrange to store them in the appropriate place.
Stores of various classes: -
Roughly speaking, there are three classes of stores
a. Central store
b. Decentralized store
c. Sub store (impressed store)
Centralized store:
The usual practice of most concerns is to have a central store. Individual stores to meet the requirements of each production department are not popular due to the high cost. For centralized stores, materials are received and published by a single store department. All materials are stored in one central store. The advantages and disadvantages of this type of store are:
Advantages of a centralized store:
a. All stores are housed in one department, so you can manage your stores better. You can minimize the risk of store obsolescence.
b. Staff Economy-Experts, or office work, floor space, records and stationery are available.
c. Better supervision is certainly possible.
d. Obsolescence of store items can be placed under close scrutiny and control.
e. You can operate a centralized material handling system, further saving space, personnel and equipment.
f. You can minimize your investment in stocks.
Disadvantages of a centralized store:
a. Due to the centralized storage, the distance travelled by the store can be long, which can increase the cost of transporting materials.
b. If the user departments are far from the store, they may delay the receipt of the store.
c. The collapse of the inter-departmental transportation system can hinder the entire process, as well as labor issues in centralized stores can stop overall concern.
d. There is an increased risk of loss due to fire, robbery, or another unfortunate incident.
e. It may not be safe to put some dangerous elements together in a central store.
Decentralized store:
This type of store has independent stores in different departments. Stores are handled by the owners of each department. Departments that need stores can withdraw stores from their respective stores in their respective departments. If you have a decentralized store, you can eliminate the disadvantages of a centralized store. However, these types of stores are unusual due to their high cost.
Central store with sub stores:
In large organizations, factories / workshops may be located in different locations far from the central store. Therefore, sub stores should be located near the factory to minimize shipping and handling costs. The quantity is determined for each item and must be kept in stock at the beginning of the period. At the end of the period, the storekeeper of each sub store requests the quantity of material consumed to bring the inventory to a given quantity from the central store. In short, this type of store operates in the same way as a retail cash system, so this store system is also known as a store management impressed system.
Advantage:
a. It ensures the prompt issuance of the store.
b. While limiting the benefits of a centralized store to sub stores, it does not sacrifice centralized control.
c. Reduce material handling costs.
d. It avoids maintaining elaborate inventory records.
Key takeaways:
- Storage of materials should not pose a danger.
- The store in charge is responsible for making good use of storage space.
- The usual practice of most concerns is to have a central store.
- A decentralized store has independent stores in different departments.
Store organisation
Importance of storage:
Material costs are one of the biggest factors in cost. Proper storage of materials is very important to prevent loss due to damage, theft or quality deterioration of the materials. Therefore, the store must be properly organized and equipped to handle raw materials.
Ideal inventory levels should be maintained for all raw material items so that the production department can obtain the required amount of material in time. Also, excess working capital is not unnecessarily trapped in excess inventory. In addition, excess inventory increases production costs. However, the store department must be under the control of a technically qualified store representative.
2. Shopkeeper function:
The store owner is responsible and needs to manage the store from all perspectives, so it should be placed higher in the management hierarchy. He is expected to assist the cost department for its effective functioning.
His duties and responsibilities are as follows:
(I) Receive materials from the receiving department.
(Ii) Maintaining proper store records.
(Iii) Arrange for proper storage of materials and finished products.
(Iv) To issue materials to the production department, contrary to appropriate and approved requirements.
(V) Monitor various inventory levels and issue requisitions to purchasing departments in time.
(Vi) Report waste, scrap, and obsolete inventories.
(Vii) To prevent unauthorized persons from entering the store.
(Viii) Regularly compare physical inventory and book numbers and adjust for any
Discrepancies.
(Ix) To keep the store clean.
(X) Make appropriate arrangements for the maintenance and storage of materials in storage.
(Xi) To recover surplus materials returned from the department or store.
The above features of the storekeeper show that storekeeping is an important factor and can greatly contribute to the efficient operation of business units.
Storage includes the following activities:
(I) Efficient and prompt issuance of materials and tools to the production sector, which is absolutely necessary to increase production.
(Ii) Receipt of materials from the warehousing and production departments.
(Iii) Organize storage in a logical order so that all items can be identified accurately and storage space is used economically and effectively
. Iv Organize inventory checks on an ongoing or regular basis so that we can provide accurate inventory quantities as needed
(V) Protect the material from damage and deterioration.
(Vi) Protect your store from theft, theft and fire.
3. Store composition:
In large organizations, management faces the problem of adopting the type of store organization.
Store type:
(A) Central store.
(B) Central store with sub stores.
(C) Independent stores in various departments.
The central store shows the centralized purchase and processing of the store.
Store benefits:
(A) It is economical because the floor area, office expenses, stationery, etc. are economical.
(B) The expertise and experience of store staff is available to ensure better management and supervision.
(C) A better layout is possible.
(D) Facilitates inventory checks.
(E) The amount of capital invested in stocks is minimized.
(F) All stores are located in one place, which is convenient for more effective management of physical inventory balance.
(G) You can regularly create brief reports on scrap and obsolete inventories.
(H) You can make better security arrangements.
However, centralized stores have some drawbacks.
Cons: Disadvantages:
(A) If the store is some distance from many departments, it will take time to deliver the materials to the production department. This causes inconvenience and delay.
(B) All types of substances are concentrated in one place, increasing the risk of fire loss.
(C) Shipping costs will increase.
(D) Due to a transportation failure at the central store, production may be stopped and costs may increase.
(E) Management is too complicated in very large stores.
4. Store layout:
As we saw in previous discussions, stores play an important role in the efficient and effective management of factories. The layout of the store should be carefully and carefully planned to ensure maximum efficiency.
The store department should receive the material from the supplier and place it in a convenient location so that it can be issued to the production department without delay. All parts of the factory should be easily accessible to minimize costs. Therefore, it is desirable that the store be centrally located in order to fulfill its responsibilities efficiently.
In a large factory with many departments, the store cannot be placed in a convenient location for delivery of materials, and at the same time the location must be close to the receiving department. Therefore, you should place your sub stores in a convenient location to serve specific parts of your organization.
Careful consideration is required for the layout of the store department. Racks, bins, shelves, etc. should be placed for easy access. There must be sufficient preparation for the open space for the truck to pass through. Special arrangements are required for the storage of materials that are affected by atmospheric conditions.
Heavy and bulky items that cannot be stored in racks or bottles should be stored on the floor. In that case, the area of the floor where these materials are stored should be marked with a white line indicating the area reserved for storing these materials.
5. Centralized store:
Large factories may choose to have a subsidiary within the production department. This facilitates the voluntary supply of materials needed by the manufacturing department. Deciding whether to have a subsidiary in a factory or a centralized store is very difficult. Before making a decision, you need to take into account the benefits of a centralized store.
Advantages of a centralized store:
I. Purchase orders can be placed according to the company's total requirements, and the more orders you have, the more costs you can save.
Ii. With a lot of small inventories, the total buffer inventories are much higher and are:
(A) There is little capital investment in stocks.
(B) The occupied space is small.
(C) Less risk of obsolescence and deterioration. And
(D) The time required to check the inventory balance is shortened.
Iii. Better supervision is possible by using specialized skills and equipment.
Iv. There are fewer administrative costs associated with inventory records.
v. Better layout of the store is possible and inventory management is more efficient.
Vi. The staff are familiar with different types of stores, so the absence of workers will not affect your work.
Vii. You can make better security arrangements.
Disadvantages of a centralized store:
Centralized storage of materials has the following drawbacks:
I. It involves increased shipping costs.
Ii. The production department needs to get the supply from remote stores, which causes inconvenience and delay in the supply of materials.
Iii. Moving small amounts of material more often increases costs and can lead to production control issues.
Iv. There is an increased risk of loss due to fire.
Key takeaways:
- Material costs are one of the biggest factors in cost.
- The store owner is responsible and needs to manage the store from all perspectives, so it should be placed higher in the management hierarchy
- In large organizations, management faces the problem of adopting the type of store organization.
- You should place your substores in a convenient location to serve specific parts of your organization.
- Centralized storage of materials has certain drawbacks.
The important methods to follow in pricing material issuance are: -
2. Actual cost method
2. First-in first-out (FIFO) method
3. Last-in first-out (LIFO) method
4. Maximum first-in first-out method (HIFO) method
5. Simple average cost method
6. Weighted average cost method
7. Periodic average cost method
8. Standard Cost method
9. Exchange cost method
20. Last-in first-out (NIFO) method
22. Base stock method.
2. Actual cost method:
If you purchase a material specifically for a particular job, the actual cost of the material will be charged to that job. Such materials are usually kept separately and published only for that particular job.
2. First-in first-out (FIFO) method:
CIMA defines FIFO as "a method of setting the price of material issuance using the purchase price of the oldest unit in stock." With this method, the materials are issued out of stock in the order in which they were first stocked. It is assumed that the material that opens first is the material that is used first.
Advantage:
(A) Easy to understand and easy to price in question.
(B) It is a good store management practice to ensure that raw materials leave stores in chronological order based on age.
(C) This is an easy method with less administrative costs than other pricing methods.
(D) This inventory valuation method is accepted under standard accounting practices.
(E) Consistent and realistic practices in inventory and finished product valuation.
(F) Inventory is valued at the latest market price, close to the value based on replacement costs.
Cons: Disadvantages:
(A) If confused with other materials purchased at a different price at a later date, it is uncertain whether the material with the longest stock will be used.
(B) If the price of the purchased material fluctuates significantly, there will be more clerical work and errors may occur.
(C) Manufacturing costs are modest in situations where prices are rising.
(D) Inflationary markets tend to lower prices for key issues. The deflationary market tends to set higher prices for these issues.
(E) Generally, it is necessary to adopt multiple prices for the publication of a single document.
(F) This method makes it difficult to compare costs for different jobs when billed for the same material at different prices.
3. Last in first out (LIFO) method:
With this method, the latest purchase is issued first. Issues are priced on the latest batch you receive and will continue to be billed until the new batch you receive arrives in stock. This is a way to set the issue price of a material using the purchase price of the latest unit in stock.
Advantage:
(A) Shares issued at more recent prices represent the current market value based on exchange costs.
(B) Easy to understand and apply.
(C) Product costs tend to be more realistic as material costs are billed at more recent prices.
(D) When the price is rising, the issue pricing will be the more recent current market price.
(E) It tends to show modest profit figures by minimizing unrealized inventory gains and valuing inventory at its pre-price value, providing a hedge against inflation.
Cons: Disadvantages:
(A) Valuation of inventory in this way is not accepted in the creation of financial accounting.
(B) This is an assumption of a cash flow pattern and is not intended to represent the actual physical flow of material from the store.
(C) It may be necessary to adopt multiple prices for one problem.
(D) It becomes difficult to compare costs between jobs.
(E) It involves more clerical work and sometimes the evaluation may go wrong.
(F) During inflation, the valuation of inventory in this way does not represent the current market price.
4. Highest in first out (HIFO) method:
With this method, the most expensive material is published first, regardless of the date of purchase. The basic assumption is that in a fluctuating inflation market, material costs are quickly absorbed into product costs, hedging the risk of inflation. This method is used when the material is in short supply and when you are running a contract with costs. This method is uncommon and is not accepted by standard accounting practices.
5. Simple average cost method:
In this way, all the materials received are merged into the inventory of existing materials and their identities are lost. The simple average price is calculated regardless of the quantity involved. The simple average cost is obtained by dividing the number of batches and adding the various prices paid during the period to the batches purchased. For example, three batches of material received in Rs. 20, rupees 22 and Rs. 24 per unit each.
The simple average price is calculated as follows:
Rs. 20+ rupees 22+ rupees 24/3 batch = Rs. 36/3 batch = 22 rupees per unit
This method takes into account the prices of different batches, but is not common because it does not take into account the quantity purchased in different batches. Use this method when the price is less volatile and the stock price is small.
6. Weighted average cost method:
This is a permanent weighted averaging system in which the issue price is recalculated each time after each receipt, taking into account both the total quantity and the total cost when calculating the weighted average price. For example, three batches of material received in a quantity of 2,000 units @ Rs. 25, 2,300 units @ Rupee 26 and 800 units @ Rs. 24.24.
The weighted average price is calculated as follows:
(2,000 units x Rs .25) + (2,300 units x Rs .26) + (800 units x Rs .24) / 2,000 units + 2,300 units + 800 units
= Rs. 25,000+ rupees 20,800 + rupees 22,200 / 3,200 units = rupees 47,000 / 3,200 units = 25.26 per rupee unit
This method tends to smooth out price fluctuations and reduce the number of calculations because each issue is billed at the same price until you receive a new batch of material.
This method is easier than FIFO and LIFO because you do not have to identify each batch individually. However, this method adds more clerical work in calculating the new average price each time you receive a new batch. The calculated issue price rarely represents the actual purchase price.
7. Periodic average cost method:
With this method, instead of recalculating the simple or weighted average cost each time you have a receipt, the average for the entire accounting period is calculated.
The average price of all materials published during the period is calculated as follows:
8. Standard cost method:
In this way, important issues are priced at a given standard issue price. The difference between the actual purchase price and the standard issue price is amortized on the income statement. The standard cost is a predetermined cost set by management before the actual material cost is known, and the standard issue price is used for all issuance to production and valuation of final stock.
Careful setting of standard prices first significantly reduces all clerical work and errors and simplifies inventory recording procedures. Eliminating cost fluctuations due to material price fluctuations makes it easier to compare realistic manufacturing costs. This method is not suitable in situations where prices fluctuate.
9. Exchange fee method:
The replacement cost is the cost of replacing the same material by purchasing it on the pricing date of the material issue. It is different from the actual cost on the purchase date. The exchange price is the exchange price of the material at the time the material is issued or on the valuation date of the end-of-term inventory.
This method is unacceptable to standard accounting practices as it reflects costs that are not actually paid. If the shares are held at exchange costs and are purchased at a lower price for balance sheet purposes, an element of profit that has not yet been realized will be included in the income statement.
This method is advocated by charging the job or process for the market price of the material, making it easier to determine the profitability of the job or process. This method is especially suitable for inflationary trends in material market prices. Without the exact market for a particular material, it is difficult to ascertain the replacement price for a material problem.
20. Next Inn First Out (NIFO) Method:
This method is a variant of the exchange cost method. In this way, the price quoted in the latest purchase order or contract is used for all issuance until a new order is placed.
22. Basic stock method:
With this method, the specified quantity of material is always kept in stock and priced as a buffer or base stock at its original cost. In addition, issuance of materials that exceed the basic stock quantity is priced using one of the above methods.
This method shows how prices fluctuate over time. However, this method is uncommon and makes stock valuation completely unrealistic and is not accepted by standard accounting practices.
Issue of Stores and Preparation of Store Ledger
Bin cards and store ledgers are two important store records that are commonly held to create records for various items.
Bin card:
A bin card is a quantitative record of receipts, issuance, and closing balances of store items. A separate bin card is maintained for each item and placed on a shelf or bin. This card is debited with the quantity of the store received, the quantity of the issued store is credited, and the balance of the quantity of the store is taken each time it is received or issued. You can easily find out the balance of an item at any time. To keep the store up-to-date balance, the principle is that you must touch the bin card before you can touch the item. For each item in the store, the material code, minimum quantity, maximum quantity, order quantity, and balance quantity are printed on the bin card. Bin cards are also known as "bin tags" or "stock cards."
Ledger storage:
BIN CARD OF An LTD | |||||||
Material Code: |
|
|
| Maximum Level: |
| ||
Mat. Description: |
|
|
| Minimum Level: |
| ||
Location: |
|
|
| Re-ordering level: |
| ||
Unit of Measurement: | |||||||
Date | Doc No. | Received from / Issued to | Receipts | Issue | Balance | Verification with Stores Ledger Date &Verified by | |
|
|
|
|
|
|
|
|
Stores Ledger is managed by the costing department (and possibly the unit price) to record the issuance of materials, including all receipts, quantities, and values. Ledger is similar to a bin card, except that receipts, issues, and balances are displayed along with the amount. The ledger contains accounts for receipts, issues, and all items in the store whose balances are recorded in both quantity and amount.
Matching store ledger with bin card:
Stores Ledger of Krishna Engineering Ltd. | |||||||||||
Material Code: | Minimum Qty: | ||||||||||
Bin No: | Maximum Qty: | ||||||||||
Material Description: | Ordering Qty: | ||||||||||
Location: |
| ||||||||||
|
| ||||||||||
Date | Receipts | Issues | Balance | ||||||||
| GR No | Qty | Rate | Amount | SR No | Qty | Rate | Amount | Qty | Rate | Amount |
|
|
|
|
|
|
|
|
|
|
|
|
Generally, there is no difference between the quantity displayed on the bin card and the store ledger. However, in reality, the difference is mainly due to the following reasons.
a. Arithmetic error when calculating balance.
b. If the document wasn't posted to either your bin card or your store ledger, it could be because the document wasn't received.
c. Post to the wrong bin card or the wrong sheet (code) in your store ledger.
d. Posting of the receipt being issued and vice versa.
e. Materials issued or received for loan or approval may be entered on the bin card, but not on the store's ledger.
The difference between a store ledger and a bin card invalidates the purpose of maintaining two separate sets and invalidates the physical inventory because the correct book balance is not available for comparison with the physical balance. I will. Therefore, various methods are used to control or reduce discrepancies between the store's ledger and bin card and maintain the correct balance of the books.
Difference between Bin Card and Stores Ledger: -
Bin Card | Stores Ledger |
(the shopkeeper manages it | (a) It is managed by the cost accounting department. |
(b) It contains only quantitative details of the materials received, issued, and returned to the store. | (b)Contains both quantity and value information |
(c) Input is made when the transaction is made | (c) Always posted after the transaction |
(d) Each transaction is posted individually. | (d) The transaction is summarized and then posted. |
(e)) Transfers between departments are not displayed on the bin card. | (e) Material transfers from one job to another are recorded for costing purposes. |
Key takeaways:
- Methods to follow in pricing material issuance.
- The simple average cost is obtained by dividing the number of batches and adding the various prices paid during the period to the batches purchased.
- The average price of all materials published during the period.
- The replacement cost is the cost of replacing the same material by purchasing it on the pricing date of the material issue.
- Bin cards and store ledgers are two important store records that are commonly held to create records for various items.
- Difference between Bin Card and Stores Ledger.
Labour Cost
Preface
Labor is an important element of production. It is a human resource and participates in the process of production. Wages paid for labor are an important cost item. Labor costs need to distinguish between direct and indirect labor. Direct labor costs can be directly identified and billed by product or job, but overhead costs are less identifiable and are included in overhead costs that may be assigned to different products or departments on appropriate criteria. Labor costing has three main purposes.
1. Determining labor costs in terms of product or service costs
2. Report labor costs for planning and management
3. Report labor costs for decision making.
Labor management
Labor costs are an important part of total production costs. Therefore, labor costs and labor costs need to be managed effectively. Various departments contribute to the efficient use of the workforce and the proper management of costs. The HR department needs to provide an efficient workforce. The engineering department maintains control over the working conditions and production methods of each job and department or process by creating plans and specifications. The time management department keeps an accurate record of the time each employee spends. Payroll preparation from the clock card, job or time ticker, or timesheet is done by the payroll department. The costing department is responsible for accumulating and classifying all data for which labor costs are one of the most important items.
Personnel costs represent human contribution. Labor costs are inherently sensitive. The reason is that labor costs are entirely based on human behaviour, labor behaviour. To manage labor costs, it is necessary to manage labor behaviour. Therefore, managers need to study human behaviour, labor performance, time and movement studies, labor turnover, and labor approaches to manage labor costs.
The workforce cannot be saved for future reference. It is very similar to the perishable nature of the material. Some materials are of poor quality and may not be used for manufacturing purposes. Such materials are wasted. Similarly, once the workforce is lost, it cannot be recovered and cannot be used effectively in the next few days.
If the work is kept idle, management will have to pay compensation or wages for such idle time. Therefore, management suffered two losses. They are lost working hours and lost money. Therefore, management is very enthusiastic about managing labor costs.
Classification of labor costs
Labor costs can be categorized as follows.
1. Direct labor costs
Direct labor costs are part of salary or wages and can be identified and billed by a single unit price of production.
Characteristics of direct labor costs:
Direct labor costs have the following characteristics.
- It has a direct relationship to the product, process, or cost unit.
- It can be measured quantitatively.
- A sufficient amount of material.
2. Indirect labor costs
Even if it occurs directly, it cannot be identified in the production of goods or services. These costs are incurred at the production site. Some cost centers may serve production departments or production activities. These cost centers are responsible for purchasing, engineering, and time management.
3. Manageable labor costs
Labor costs can be managed by managers during production and even when there is no production. Standard hours and hourly rates are fixed and workers can be required to complete a job or order within such time. That way, labor costs can be reduced to some extent.
4. Uncontrollable labor costs
Labor costs that management cannot easily control. Jobs and orders can be completed by a group of workers. The efficiency of such labor groups is inherently different. Workers can maximize their efficiency according to the general environment of the product location. If so, costs cannot be controlled by management.
Information required for labor cost management
To effectively manage labor costs, you need the following information:
3. Worker recruitment costs.
2. Worker training costs.
3. Worker turnover rate.
4. Idle time.
5. Over time.
6. Shift work.
7. Labor efficiency.
8. Number of workers.
9. Useless.
30. Corruption.
33. Payment of wages.
Personnel cost management method or method
To effectively manage labor costs, management can do the following:
3. Appropriate production planning.
2. Standard time correction.
3. Fixed clear wage structure.
4. Agreement with workers.
5. Preparation of labor budget, that is, labor cost budget and working time budget.
6. Labor performance report.
7. Modification of specific incentive payments
Computation of Labour cost
How to Calculate Labour Cost: Per Hour, Per Unit, Techniques and Formula
Techniques for managing labor costs can be effectively used by coordinating the activities of various labor-related departments.
(A) Human Resources Department
(B) Engineering and Operations Research Division
(C) Timekeeping department
(D) Payroll department and
(E) Cost accounting department.
The capabilities of these departments in reviewing and managing labor costs are described in detail below.
(A) Human Resources Department:
The Board of Directors has policies regarding recruitment, training, placement, transfer and promotion of employees. The Human Resources Manager of the Human Resources Department must implement these policies. The main functions of this department are recruitment, training, and placement of workers in the right jobs.
The Human Resources department recruits’ workers when it receives employee placement requests from various departments.
(I) Employee placement request:
This is a document initiated by a department that needs employees. Upon receipt of the job, the Human Resources Department will take action to appoint a worker by receiving the application, scrutinizing the application, interviewing the applicant, and finally selecting the appropriate candidate.
The proforma for employee placement requests is:
All workers are appointed according to the labor budget. The budget specifies the number of workers appointed and the skills required. It is the task of the Human Resources Department to comply with the budget and appoint additional workers only if approved by the competent authority.
At the time of appointment, each worker is assigned a number, which is quoted in all communications relating to the worker. This makes it easy to identify EDP workers and systematically maintain information about them.
(II) Employee history card:
The Human Resources department maintains full details of the workers employed. Details for each employee are kept on the employee's history card. The card contains all relevant information such as (a) name and address, (b) number, (c) department, (d) date of employment, (e) category, (f) education qualification (g) experience (h), etc. It contains. Former employer's name and reason for retirement (i) Salary scale (j) Skills (k) Promotion (l) Reason for retirement. These details help management evaluate employees, especially the last column to help management prevent turnover.
Managing worker recruitment is essential to optimizing the right number of workers.
The following measures will help you manage the recruitment of workers.
(1) Hiring goes through the Human Resources Department.
(2) Hiring is done according to the labor budget.
(3) Hiring will be done only when you receive a job offer.
(4) In addition to budget labor, additional workers must be hired only if sanctions are imposed by the appropriate authorities.
(5) Recruitment of temporary workers should be properly approved.
(6) Introduce mechanization as much as possible.
(7) Labor utilization reports from all relevant departments so that management can make decisions on hiring surplus workers, hiring temporary workers, using surplus labor, reducing labor, reducing labor turnover, etc. Request.
B) Engineering and Operations Research Division:
Preface:
This department is working to improve working conditions by carrying out the following activities.
(1) Conduct work studies such as method study, exercise study, and time study for each operation.
(2) Maintain the necessary safety standards.
(3) Perform job analysis and job evaluation.
(4) Prepare the specifications and time schedule for each job.
(5) Devise an appropriate wage system and
(6) Implementation of research and experimental work.
The engineering department is basically responsible for work content, standard time, work performance, and so on. These are achieved by performing detailed work studies, including method studies, motion studies, and time studies.
Work study:
Work study is the study of the technical aspects of production. This includes detailed investigation of processes, operations, job evaluation and analysis, and work measurements. Therefore, work studies include method studies, exercise studies, and time studies.
(I) Method study:
It is a procedure to analyse the work, remove unnecessary work and practices, systematically organize the remaining work, and standardize the work method. Motion studies only follow after deciding on the best way to do the work-
II) Motion study:
This is an important part of work study that divides the work into several key elements. Each of these elements is analysed in detail individually and in relation to each other. When the timing of these elements is set. Motion studies eliminate unnecessary and inefficient motion, "minimizing waste."
The main purpose of motion research is to standardize work practices by saving effort, reducing fatigue and improving efficiency. Motion studies take into account the human elements of work, plants and machines, tools and materials used. Once the motion study is complete, you need to perform a "time study".
(III) Time study:
Fixing the standard time for each operation is called a "time study". Also called workload measurement. Standard time is fixed for each operation. This is a fictitious time to measure the amount of work done in an hour. This helps management evaluate labor requirements, fix wage rates, and implement incentive schemes. Systematic method studies, along with exercise and time studies, help standardize work, equipment and methods. It is also useful for cost control, output and wage control.
Job analysis:
Job analysis is the process of determining the list of qualifications a worker has to do the job effectively.
The US Department of Labor defines job analysis as follows: “The process of making decisions by observing, investigating and reporting relevant information related to the nature of the job. It constitutes the skills, knowledge, abilities and responsibilities required of workers for work and successful performance. And it's a task decision that differentiates your work from everything else.
Therefore, job analysis is a study of work, identifying obligations and responsibilities, conditions of performance, nature of work, qualifications to own, opportunities and privileges related to the performance of the work.
Job analysis elements:
Job-related information can be analysed in the following two subheadings:
1. Analysis of work-related information:
This analysis analyses the requirements of the job. The requirement is known as a job description.
2. Employer-related analysis:
This analysis analyses the qualities that an employee should have. The qualities that a job holder should have are called job specifications.
Benefits of job analysis:
1. Fixed appropriate wage rate:
Fees are fixed according to the nature of each job, so fixed fees are reasonable and fair.
2. Elimination of personal prejudice:
Disputes over wage inequality are avoided because fees are fixed based on the nature of the job, not the value of individual workers.
3. Effective recruitment:
Job analysis guarantees the right job or the right person's policy of "no square pegs in round holes" because the job description and job specifications are key elements of job analysis.
4. Effective training:
Job analyses procedures help identify the qualifications and skills required for each job. Therefore, workers can be trained in the skills required for a particular job.
Job evaluation:
(1) Meaning and purpose:
Job valuation is the process of investigating and assessing the relative value of jobs within the industry and confirming their comparative value.
In addition to showing relative wage values, job valuation serves a variety of purposes:
(A) Helps to know if workers have the job that best suits them and if it benefits the employer.
(B) Help the HR department hire workers by demonstrating job responsibilities, requirements, conditions, and the qualities required for each job.
(C) Job evaluation forms the basis of a training plan.
Benefits of job evaluation:
(I) to employers:
(A) The hired employees are suitable for the job because the qualities required for the job are specified.
(B) The wage fund is fairly distributed because the labor value is confirmed by job evaluation.
(C) Job evaluation helps to minimize turnover.
(II) To employees:
(A) Jobs are best suited to employees because they are appointed based on the required qualities, skills and experience.
(B) Job evaluation reveals the comparative value of a job and the prospects it has for its employees.
(C) Workers will be happier because their total wages will be distributed fairly to them.
(3) Job evaluation procedure:
(A) Detailed work study
(B) Job description
(C) Job analysis
(D) Arranging work in progress and
(F) Determining the wage value of a job.
(4) Job evaluation method:
There are four ways to evaluate a job, as explained below.
(A) Ranking method:
In this way, jobs are rated from highest to lowest according to relative responsibility and complexity, not wage rates. Wage rates are assigned to jobs based on the prevailing rate in the area. This method is simple and suitable for small factories. The effect is limited because it does not accurately measure the work.
(B) Rating or classification method:
This method defines the basis of evaluation and divides the work into different grades. For example, grades can be categorized as skilled, unskilled, supervisory, executive, and administrative. Once your grades are confirmed, your work will be reviewed and your grades will be appropriate. Jobs in each grade are ranked as more sophisticated.
(C) Factor point scoring:
Evaluation of work in this way is done by comparing and analyzing the work against common factors. Points are assigned to each element according to their relative importance.
The most commonly recognized factors are:
(A) Education
(B) Experience and skills
(C) Job complexity
(D) Responsibility
(E) Effort and
(F) Working conditions.
Once jobs are analysed and points are assigned based on a common i-factor, the available wages are distributed among the jobs in proportion to the total points for each job.
The main advantage of this method is that it is easy to operate and the results are accurate.
The main drawbacks are:
(1) The points are not clearly defined.
(2) Points for each element are not scientifically assigned.
(3) Jobs that require extraordinary expectations cannot be analyzed with fixed factors.
(D) Factor comparison method:
This is similar to how factor points are scored. Jobs are analyzed, compared, and ranked under five factors:
(A) Mental requirements
(B) Skill requirements
(C) Physical requirements
(D) Responsibility and
(E) Working conditions.
These factors are evaluated by allocating existing wage rates to each. Jobs are compared by size and factor of "major jobs". The sum of the values of all the elements is the cache rate for each job.
(E) Merit evaluation:
Merit evaluation is intended to evaluate the performance of workers. The main purpose of merit assessment is to reward employees based on efficiency and merit. Merit evaluation brings out the comparative value of workers. The characteristics that are commonly considered to determine a worker's benefits and values are:
(1) Educational qualifications and knowledge
(2) Skills and experience
(3) Attitude toward work
(4) Quality of work done
(5) Efficiency
(6) Regularity
(7) Honesty
(8) Reliability
(9) Qualities such as leadership, initiative, self-confidence, and judgment
(10) Discipline and
(11) Cooperation.
Points are assigned to the above traits, and the total points scored for all traits determine the value of the worker. Employees are evaluated individually for each score and grouped based on a common score.
Importance of merit evaluation:
Merit assessment is a valuable tool that is considered important for measuring human resources.
The merit evaluation has the following advantages.
(1) It is useful to know the value and characteristics of individual workers. This helps supervisors assign tasks that workers are familiar with.
(2) It points out the characteristics that workers are not skilled. Workers have the opportunity to improve with proper training.
(3) Helps increase wages and opportunities for promotion.
(4) Recognizing the benefits and values of workers helps to stimulate their confidence.
Merit evaluation restrictions:
(1) Workers may be valued based on a single characteristic. The evaluator may ignore other features that the worker may not be good at.
(2) Disagreements among members of the Merit Evaluation Committee can lead to inadequate evaluation.
(3) Rating men are affected by personal discomfort with certain workers, which can lead to inadequate ratings.
(C) Time management department:
This department is concerned with maintaining worker attendance and working hours. Attendance time is recorded for wage calculation, and job time or time reservations are spent on each department, job, operation, and process to calculate labor costs for each department, job, and each process and operation. It will be considered to calculate the time taken.
Purpose of time management:
(1) Ensuring employee regularity
(2) Strengthen discipline among the labor force.
(3) Meets safety requirements
(4) Helps prepare for payroll.
(5) Track normality! Time, late, early leave.
(6) Used to absorb overhead costs based on working hours.
Depending on the size of your organization, there may be another time office at the factory gate. If your company is small, a gate office representative may be responsible for recording the time. Accurate time recording is essential because wage payments are based on the time spent by workers.
The point of a good time management system:
(1) A good time management system prevents "proxy" between workers.
(2) Even piecework workers must manage their time in order to maintain uniformity, regularity and continuous flow of production.
(3) Both arrivals and departures of workers should be recorded so that the total time spent by workers can be used for wage calculation.
(4) Mechanized time management methods should be used to avoid conflicts.
(5) Late arrival times and early departure times should be recorded to maintain discipline.
(6) Time recording should be simple, quick and smooth.
(7) Time records are supervised by the responsible person to eliminate irregularities.
Time management method:
There are two ways to manage time.
(1) Manual method.
(2) Mechanical method.
(1) The manual timing method is as follows.
(A) Attendance registration method.
(B) Metal disc method.
(A) Attendance registration method:
This is one of the traditional methods of time management. Attendance records are kept for workers in the time office or department adjacent to the factory gate. The register contains details about the worker's name, worker's number, the department in which he is employed, arrival time, departure time, normal time, passage of time, and more. Arrival and departure times may be recorded by the timekeeper.
This method is cheap and easy. Suitable for small organizations. In this way, workers and timekeepers are colluding, which can lead to fraudulent practices.
(B) Metal disc method:
In this way, the worker is assigned a disk or token with a hole containing the worker's identification number. The disc or token is hung on the board with pegs. The board of directors may be maintained individually for each department. Workers take out tokens and put them in the designated boxes when they enter the factory.
The box is deleted after the scheduled time. Late workers need to remove the token and hand it over to a timekeeper who records the exact arrival time. If tokens remain, they indicate an absent worker. The timekeeper then records attendance at a register called the "Daily Master Role" that the payroll department uses to create wage invoices and wage slips.
This method is simple and straightforward. If you have employees who are illiterate, you can follow them. You can easily identify the token. It can also be used by large companies with a large number of workers.
However, it has certain drawbacks-
(A) Employees may delete the companion token to mark attendance even when the companion is absent.
(B) The timekeeper can make mistakes, which can lead to disputes regarding the arrival time of workers.
(C) The master role may be a timekeeper with a dummy or ghost worker.
2. Mechanical method:
Time clocks are used to maintain accuracy and reliability.
There are two types of such devices.
(A) Time clock.
(B) Record dial time.
(A) Time clock:
Time cards are assigned to each worker for a week. Time cards are stored in the gate tray with a serial number. Workers remove the card from the tray and enter it into a time clock that records the exact time of arrival in the allocated space. This can also be done over time, departures, lunch breaks, and over time.
The time card may also contain details about hourly wages, total wages, deductions, and net wages. Wages are calculated based on the time recorded.
Below is a sample card that combines time and payroll.
(B) Dial time recorder:
This machine has a 24-hour dial. There are about 150 holes on the dial, and each hole has a number corresponding to the worker's identification number. There is a radial arm in the center of the dial. The worker needs to place the radial arm in the hole of his number and his time is automatically recorded on the roll for the worker's number.
The worker's time is transferred by the machine to the wage table. The machine also calculates the wages of the workers. It provides excellent accuracy and saves time. The only limitation of dial time clocks is their high installation cost and their availability to a limited number of workers.
Time reservation:
The amount of time a worker spends on a variety of jobs and tasks is called a time reservation. This is a worker's productive time.
The purpose of time booking is to:
(1) We guarantee that the time paid according to time management will be used properly for work and orders.
(2) The cost department can check the labor cost of each job or work order.
(3) Helps distribute and distribute wages between different departments on which the working hour rate method is used.
(4) Useful for calculating idle time.
(5) By clarifying the time spent by workers on various jobs, it is useful when the incentive system is operated in the factory.
(6) Time reservations also help measure worker efficiency by comparing standard work hours with actual hours.
The documents used for time reservation are as follows.
(A) Daily timesheet.
(B) Weekly timesheet.
(C) Job ticket or job card.
(A) Daily timesheet:
A daily timesheet is issued to each worker who records the time spent on various tasks of the day. These sheets are used by small businesses with a small number of workers. The daily timesheet is verified and signed by Foreman at the end of each day.
Below is a sample daily timesheet.
(B) Weekly timesheet:
This is an improvement over the daily timesheet because the daily timesheet increases the number of documents and the amount of work. Weekly timesheets are filled out by workers, verified by supervisors and counter-signed. In some cases, it is filled by department clerks to avoid incorrect input by workers. In addition, the foreman's precious time is not wasted to confirm the worker's input.
Below is a sample form of the weekly timesheet.
(C) Job card:
Job cards are used to accurately reach the time spent on each job.
There are four types of job cards used:
(I) Job card for each worker
(II) Job card for each job
(III) Combination of time and job card, and
(IV) Piece work.
(I) Job card for each worker:
Job cards are issued to each worker for a week or a day. The start and completion of each job is recorded. This serves the dual purpose of checking the time spent on each job and the total time the worker worked during the week or day.
(Ii) Job card for each job:
A card will be issued for each job. This is essential if the job needs to go through a large number of workers to complete. You can check the total number of working hours and total labor cost from the card.
The sample job card is as follows.
(III) Combination of time and job card:
It serves two purposes: time management and time booking. The card shows attendance and working hours. Cards can only be used when the number of workers is small.
A sample card is shown below.
(Iv) Piece work:
This card is maintained by companies that use piece work to pay their wages. When payments are made on a results basis, production is taken into account, but time spent by workers is not. However, time must also be recorded to maintain the flow of production and discipline among workers. The piece work card shows the production volume, the refusal if any, and the piece work.
A sample piece work is shown below.
Time management and time reservation coordination:
(I) Idle time:
Attendance time must match work time. In general, it doesn't happen for many reasons. Examples-Time required to walk from the factory gate to the department, materials, tools, time lost to wait for instructions, loss due to machine failure, power outages, etc. This wasted time is called idle time. The idle time card is provided to check the idle time. The idle time card shows the reason for the idle time, so you can take action to prevent avoidable idle time.
A sample idle time card is shown below.
Idle time type:
Idle time can be divided into two categories based on the cause or reason for its occurrence.
(A) Normal idle time.
(B) Abnormal idle time.
(A) Normal idle time:
This is unique to all types of employment and cannot be avoided. The cost of this time is borne by each job or product or department.
An example of normal idle time is shown below.
(1) The time it takes for a worker to walk from the gate to the department.
(2) Time required to receive tools, change clothes, and receive work instructions.
(3) The time it takes to change from one job to another.
(4) Personal needs and time required for tea.
(5) Wait time for the machine to be ready for production work (called setup time).
Normal idle time processing:
There are two ways to charge your production environment during normal idle time:
(1) Normal idle time costs will be factory costs and will be collected as indirect costs.
(2) Normal idle time costs are charged directly to production as direct wages.
(B) Abnormal idle time:
Abnormal idle time is the avoidable idle time caused by preventable conditions.
The reasons why the idle time is abnormal are as follows.
(1) Time lost due to machine failure,
(2) Time lost due to a power outage.
(3) Loss of time due to lack of materials.
(4) Wasted time because there is no instruction. And
(5) Time lost due to strikes and lockouts.
Handling of abnormal idle time:
The basic principle of costing is to eliminate the impact of all anomalous losses and profits on a job or process or operation by transferring all anomalous costs and profits to the income statement. They should not form part of the production cost. Wages paid for abnormal idle time are charged to the costing profit and loss account.
Idle time control:
It is necessary to analyse the reasons for idle time and take measures to prepare for all contingencies, such as preventive maintenance of machines, proper arrangements to provide sufficient materials, preparation of work instructions in advance, and avoidance of strikes. There is. Even normal idle time can be controlled by efficient management planning and supervision.
(II) Overtime:
Employees are expected to work on a fixed schedule of day or week. If they work beyond it-overtime is called overtime. In other words, work that is done beyond normal time is called overtime.
The Indian Factory Act provides for overtime pay twice as much as usual. If a worker works more than 9 hours a day or more than 48 hours a week, he or she will be treated as overtime and will be paid twice as much as usual. Wages are calculated at the normal rate of up to 9 hours and at twice the normal rate of working more than 9 hours a day, or at a single rate of up to 48 hours and over 48 hours It is calculated at twice the normal rate.
The additional amount paid to a worker for overtime work is called overtime premium.
Overtime is not recommended as it increases production costs for the following reasons:
(1) Overtime is paid twice as much as usual.
(2) Overtime is done after normal hours at midnight, when fatigue may occur and workers' efficiency may not reach the required level.
(3) In order to work enough for overtime, workers may not be able to reach their full potential during normal hours.
(4) It is necessary to bear additional expenses for overtime work such as electricity bill, plant maintenance, wear and tear, and supervision.
Each of the above pushes costs up, so unless there is a demand for output that revenue justifies additional costs, it is not desirable over time.
Overtime treatment:
Regular wages form part of labor costs directly, but there is controversy over the treatment of overtime pay. Work done during normal hours has to bear a single rate, and work done over time is twice as expensive, creating "unfairness". To eliminate this, regular wages will be raised to include overtime pay, and regular hours or overtime work will bear the same costs.
However, if overtime is done under pressure from a particular customer, that customer will be charged for overtime. If overtime is due to an unusual reason, such as a machine failure or power outage, overtime will be charged directly to the income statement as an extraordinary cost.
Overtime management:
Overtime has many disadvantages and should be avoided and maximized control.
The following measures have been proposed.
(1) All normal work must be completed in normal time so that there is little room for overtime.
(2) Long-term justification should be supported by substantive interests, and long-term justification should be approved by the competent authority.
(3) The upper limit of time must be fixed for each worker.
(4) Frequent and regular reports should be prepared and forwarded to management regarding overtime hours and their costs. This allows management to take corrective action.
(D) Salary department:
Purpose:
This department creates payment invoices for the entire organization.
The purpose of the payroll department is to:
(1) Keep records of each worker's work, department and wage rate to reach each worker's total income, deductions and net income.
(2) Check the wages of various cost centers.
(3) Summarize the total deduction amount and post it to the relevant account.
(4) Check the total time of each cost center and calculate the labor cost and the hourly rate for management purposes.
(5) Confirmation of overtime pay and idle hourly wage.
(6) Provide an internal check system for wage payments.
Payroll Preparation:
A department salary or wage table is created based on the time card. A full-fledged payroll shows total wages, various deductions, and net wages. Payroll is the basis for checking wages and posting entries to various management accounts. Payroll details depend on your organization's requirements.
Below is a sample payroll.
There are two aspects to payroll preparation. One is to reach total wages paid in the form of wages, including premiums and allowances over time. The second aspect of payroll is to calculate deductions in the form of ESI, PF, income tax, mortgage and prepayment related collections. Nowadays, most companies use computers to prepare for this.
Notes on paying wages:
Various types of fraud can occur in connection with wage payments. Unless the right systems are designed to prevent these frauds, repeated losses can occur and reduce the profitability of the enterprise. Effective internal checks and specific precautions can help reduce and prevent fraud in wage payments.
Here are the detailed steps for time management, time booking, payroll preparation, and finally wage payments to reduce wage payment fraud.
(1) Time management should be performed mechanically as much as possible, and appropriate and efficient supervision is essential to avoid time management fraud.
(2) How to calculate wages, various allowances, incentives and deductions should be simple and clear so that no doubt arises.
(3) If piece work is widespread, inspect the product quickly to maintain the quality of the product and pay only for the good product.
(4) If the incentive system is operated on a time basis, a record of actual working hours and saved hours will be maintained.
(5) Overtime should be approved by the appropriate sanctions of the competent authority. We will compare actual overtime with approved overtime to identify unapproved overtime and take appropriate measures to prevent it.
(6) Introduce effective internal checks when creating wage tables. The work done by the clerk needs to be verified by another clerk to ensure accuracy and perform internal checks to prevent fraud.
(7) The cashier must not have a role when creating the wage table. Similarly, the clerk involved in creating a wage table should not be involved in creating a wage envelope.
(8) The wage table is verified by a personnel officer to detect fraudulently included dummy workers.
(9) It can be seen that the workers have been identified before the wages are handed over to each person.
(10) Payment of wages shall be made simultaneously in all departments so that workers are not present in two places.
(11) Wages for absentees due to illness shall be paid only on the basis of an appropriate approval letter.
(12) Unpaid wages are entered in a separate record kept for that purpose. Attention should be paid while paying these wages.
(E) Cost accounting department:
The department is responsible for ensuring the correct production costs.
Cost verification includes classification, collection, and calculation of output labor costs. In most organizations, cost department representatives
Posted to the manufacturing department to accumulate and categorize costs. The cost calculator oversees the work of the representative and uses the information contained in the timecard and payroll to find the labor costs of manufacturing-by-manufacturing department, operations, manufacturing instructions, and so on.
The costing department also analyses labor costs in the form of idle time and overtime. A labor cost report is also submitted to management to show the effectiveness of labor use.
Wage Accounting Documents:
(1) Clock card, job card, idle time card:
These are the basic documents for calculating labor costs for jobs, departments, operations, and jobs. Adjusting the clock card and job card is essential to reveal the idle time.
(2) Ratio of wage table and deduction chart:
These documents will help you prepare for payroll.
(3) Wage analysis or wage summary:
This is a salary analysis for various control accounts. This is a summary of the wages paid per job and the wages paid during idle hours. These totals must match the total wages paid.
Wage analysis:
The wages charged for various jobs are shown on an analysis sheet called the Wage Analysis Sheet. This is suitable if your company is small and the number of jobs running is small.
If you have a lot of work, as in a large company, the timesheet will pre-list the total labor costs and agree with a payroll overview.
The wage summary decisions are as follows:
The analysis sheet shows the labor costs for various jobs and the overhead costs charged as overhead costs.
(4) Journals and ledgers:
Posting of various transactions related to labor costs is done from payroll. Various transactions are posted to the control account in the general ledger. Various sub ledgers in the form of work in process ledgers, factory overhead ledgers, etc. are posted along with the relevant labor cost items.
Key takeaways:
- Labor is an important element of production.
- Labor costs can be categorized as follows.
- Calculate Labour Cost
- Work study is the study of the technical aspects of production.
- Job analysis is the process of determining the list of qualifications a worker has to do the job effectively.
- Job valuation is the process of investigating and assessing the relative value of jobs within the industry and confirming their comparative value.
- Merit assessment is a valuable tool that is considered important for measuring human resources.
- Attendance time is recorded for wage calculation.
- Time cards are assigned to each worker for a week
There are the following types of incentive wage systems:
1. Halsey Premium Plan
2. Rowan Premium Plan
3. Taylor Differential Peace Rate System
4. Gantt Bonus Plan
5. Emerson Efficiency Plan
6. Bedo Point Premium
7. Merrick Differential Wage Multi-Piece Rate Plan
8. 100% bonus plan.
Halsey Premium Plan:
This plan was introduced in 1891 by American engineer F. A. Halsey. Recognize your personal efficiency and pay bonuses based on the lime saved. In this way, workers are paid at the rate of the hours they actually worked and are also paid a bonus if they can complete the work in less time than the time allotted to do the work.
Bonuses are paid at a fixed percentage of the time saved, usually 50% (although the percentage varies from 30% to 70% of the time saved). The remaining 50% of the time saved will be shared by the employer.
Therefore,
Total revenue = T.T. × H.R. + 50% (T.S. × H.R.)
Here, T.T. = Time required
H.R. = hourly wage
T.S. = Time saved
The main advantages of this method are:
(I) the method is simple to operate and easy to understand.
(II) Late workers are not punished because hourly wages are guaranteed.
(III) Provide incentives for more efficient workers.
(IV) Worker efficiency means reducing costs per unit.
(V) The benefits of time savings are shared equally between employers and employees.
The main drawbacks of this method are:
(I) many employee organizations do not like to share the benefits of time savings equally.
(II) Attracting bonuses reduces the quality of work.
(III) Poor quality means more waste, potential for corruption, defects and failures, and more oversight costs.
(IV) Not as attractive as peace rate payments.
(V) There are few incentives for workers compared to other incentive plans.
(VI) This can lead to higher bonuses if the time rate is not fixed properly.
Halsey-Weir Premium Scheme:
This scheme was introduced by Weir Ltd. In Glasgow around 1900. This scheme is similar to the Halsey scheme, except that employees get 33⅓% (often 30%) of the time saved as a bonus and the remaining 66⅔% is paid to the employer.
Therefore:
Total revenue = T.T. × H.R. + 33⅓% (T.S. × H.R.)
Here, T.T. = Time required
H.R. = hourly wage
T.S. = Time saved
Rowan plan:
Grames Rowan first introduced this plan in Glasgow in 1898. In this scheme, like the Halsey scheme, workers receive a guaranteed hourly wage for actual working hours. However, premiums are calculated differently here.
If a worker can complete a job in less time than allowed, his bonus is to his hourly wage for that percentage of the time saved to endure the allowed time. Will be equal.
Therefore, the bonus is calculated as follows:
And total revenue = T.T x H.R. + (T.T. × H.R.) × T.S. / T.A.
Here, T.T. = Time required
H.R. = hourly wage
T.S. = Time saved
T.A. = Allowable time
The main advantages of this scheme are:
(I) It provides incentives for learners and slow workers.
(II) Premiums are proportional to the time saved, so employers are protected if they are not properly fixed.
(III) From the employer's point of view, the Rowan scheme is safer than the Halsey scheme.
(IV) With up to 50% of the time saved, the bonus for this scheme will be higher than the bonus for the Halsey scheme.
(V) As the bonus increases at a rate of decrease. Employees are not in a hurry to complete their work quickly, reducing the possibility of waste.
(VI) Due to the high output, the fixed overhead per unit is low.
The main drawbacks are:
(I) the method is complicated.
(II) Incentives are low at high production levels.
(III) Employees are willing to share their time savings with their employer.
Comparison of Halsey and Rowan schemes:
(1) With savings of up to 50%, premiums will be the same for the two schemes.
(2) In the Rowan scheme, the bonus rises faster than in the Halcy scheme until the job runs in half the standard time.
(3) However, if the work takes less than half the standard time, both the Halsey system premium and the total income will be higher than the Rowan system premium.
(4) On the other hand, if the work time exceeds half of the standard time, both the bonus and total income of the Rowan scheme will be larger than that of the Halsey scheme.
(5) The Halsey scheme provides more incentives to speed up production, but after certain stages there is an automatic check under the Rowan scheme.
(6) The Halsey scheme turns out to be costly if more than half the time is saved, while the Rowan scheme is costly if less than half the standard time is saved.
Taylor's Differential Peace Rate System:
This system was first introduced by F.W. Taylor, the father of scientific management. This system does not provide a minimum guaranteed hourly wage.
However, in this system, the two-piece rates are fixed.
(A) Workers are paid a low peace rate for substandard production
(B) Higher fees are paid to workers who produce above the standard. Therefore, this system penalizes inefficient workers and rewards efficient workers.
Worker efficiency can be determined as one of the following percentages:
(I) from the time allowed for the job to the time actually taken, or
(II) From the actual output within the specified time to the standard output.
Key Takeaways:
- Types of incentive wage systems
- Comparison of Halsey and Rowan schemes
- Taylor's Differential Peace Rate System
Overview of overhead
All overhead costs are collectively referred to as overhead costs. This is the sum of all indirect materials, indirect labor, and indirect expenses. They make up a key component of the total cost of a product, job, or process. Overhead is not directly measurable and is observed in relation to a particular activity or unit of production, but must be incurred in production. Examples: Factory building and machine depreciation, rent, taxes, insurance, maintenance, etc.
Classification of expenses
The process of grouping overheads according to common characteristics is known as overhead classification. It provides managers with information that allows them to effectively manage their business. Overhead can be categorized as follows:
a. Elements: indirect materials, labor costs;
b. Function: Expenses for production, management, sales and distribution.
c. Behaviour: Fixed, variable, and semi-variable overhead.
1. Fixed overhead remains fixed and is not affected by changes in production levels. For example, rent, fees, salaries, statutory expenses, etc.
2. Variable overhead costs change in direct proportion to changes in production, such as indirect materials, fuel, electricity, stationery, and sales staff commissions.
3. Semi-variable overhead costs are partially fixed and partially variable costs. They remain fixed to production volume and change when production exceeds a certain volume. For example, telephone charges include machine depreciation, repair and maintenance, and supervision costs.
Collection of expenses and codification
Overhead is collected and systematized under the appropriate head. Similar overhead items should be grouped. Overhead grouping is done by a technique called "Codification". This is a way to identify and describe various expenses with numbers, letters, or a combination of both, making it easy to collect cost data. The coding of the entire item is done through a proper coding system. Expenses are collected through store requests, financial accounting, wage tables, registries, and report sources.
Key Takeaways:
- All overhead costs are collectively referred to as overhead costs.
- Variable overhead costs change in direct proportion to changes in production.
- Overhead is collected and systematized under the appropriate head.
Overhead allocation is the allocation of all items of costs to cost centers or costs to units. This refers to the billing of overhead costs to the cost center. This means that overhead was incurred due to the existence of that cost center. If a company offers multiple products, factory overhead is allocated to different production departments or cost centers. Appropriate overhead allocation is very important because incorrect allocations can distort income decisions, asset valuations, and performance valuations. The overhead allocation process is as follows:
I. Accumulate overhead costs based on department or product.
Ii. Identify cost targets for assigned costs
Iii. Choose how to associate such accumulated costs with cost goals.
Key Takeaways:
- Overhead allocation is the allocation of all items of costs to cost centers or costs to units.
- The overhead allocation process.